What is The Average Time to Complete a Kitchen Remodel?

How to renovate a kitchen or remodel a kitchen? Where to begin the kitchen remodel process? Many business owners who have decided to take such a significant step to ask this question.

Renovation work in even a small kitchen will turn into a disaster if there isn’t a clear strategy in place. Organize the procedure properly, and after a while, you’ll be enjoying the pleasant, lovely space you’ve refurbished with your own hands.

The order of work: where should the kitchen repair in the flat begin?

 

Owners frequently break the first guideline of repair: do not begin work without a completed design project. The habit of doing everything “by eye” can play a cruel joke with unfortunate repairmen.

Either there are not enough materials, or the layout is not suitable for a particular room, or the combination of wallpaper in the interior does not fit into the overall concept. The consequences of negligence can be very serious.

Regardless of the size of the kitchen or the materials you choose, the sequence of labor remains the same.

Finishing work always moves from top to bottom:

  • Ceiling
  • Walls
  • Floor

Violating the procedure is not worth it, and painting the ceiling cannot be the final step. As a result, the new flooring will be splattered with paint streaks or contaminated with wall plaster residue. Self-deception is self-deception; protective layers such as film or newspapers do not save the situation.

The following is the order in which the construction and finishing work is completed:

 

  • Exemption of the premises from furniture, textiles, accessories. The kitchen in the house should be empty.
  • Dismantling of the old coating on the walls and ceiling. The last is to remove the damaged floor covering.
  • Collection and removal of all construction debris.
  • Wiring new electrical wiring and installing sockets and switches in predetermined locations.
  • Conclusion of wires for arranging to light.
  • Installation of new plumbing fixtures.
  • Ceiling repair
  • Alignment and decoration of walls.
  • Floor covering.

Wiring, sockets.

 

Hire a qualified electrician. Leave electrical work to a professional. The master will replace worn-out wires with new ones made of higher-quality material if necessary.

Decide where the household appliances will be placed. Consider the required number of outlets in advance. After the repair work is completed, it is difficult to add new electrical outlets. This material contains information on stone sinks.

The new kitchens in most apartments and houses contains a typical range of household and electrical gadgets.

The main positions of lighting the working area:

  • fridge;
  • microwave;
  • hood;
  • electric stove;
  • general lighting;
  • television

Sewerage.

 

When installing new equipment, reconstructing the water supply and sanitation system, follow the procedure:

  • Draw a sewer layout plan.
  • Make a note of where the pipes are, how steep they are, and how long the portions are.
  • Consider where you’ll put the sink, washer, and dishwasher in the kitchen.
  • Check the condition of the old sewer system.
  • Calculate the amount of new pipe needed and the number of connecting parts. Make a list and purchase everything on it.
  • Place the system on the floor and attach the relevant components.
  • Dismantle old pipes and fittings.
  • Mount new pipelines, seal the joints.
  • Plug in a sink.
  • Check the joints for leaks after the sealant has cured.

Wall repair.

 

After installing a modern stretch ceiling or painting the old one, you can begin to bring the walls “in divine form.” Remember what style will be in your kitchen. Choose the proper materials to decorate the kitchen walls based on the direction. Walls in the kitchen that are suitable for:

  • non-woven and vinyl wallpaper;
  • bamboo cover;
  • cullet;
  • stone;
  • artistic plaster;
  • waterproof types of paint;
  • tile;
  • Wall panels.

Kitchen design project.

 

To draw up a design project for the repair and equipping of the kitchen, it is not at all necessary to invite an expensive specialist or plan large-scale events for an elite renovation. Modern design projects are a must, because even cosmetic repairs in the kitchen must be carried out on schedule and using pre-selected technologies and materials.

Therefore, you can independently draw up a plan of the room and a list of materials: draw diagrams for laying communications and electrical wiring on it, designate the placement of electrical appliances and plumbing. When overhauling the kitchen premises, plan in advance the arrangement of furniture and household appliances. This is guaranteed to save you from unforeseen work in the future on the transfer of sockets and risers. For example, when purchasing a new powerful hood, it may turn out that the actual section of the existing ventilation duct is not enough. Then it is necessary to carry out work on the withdrawal of the hood directly to the street.

If you plan to mount a multi-level plasterboard structure on the ceiling, make a diagram with the calculation of materials and a drawing of electric lighting. It is necessary at this stage to decide on the finishing of the room, especially those that require careful preparation, for example, laying parquet or making high-quality Venetian plaster on the walls.